Bestcare Facilities Group

Machinery Relocation in Nairobi Kenya | Bestcare Facilities Group

Machinery Relocation in Nairobi Moving a machine is not like moving a table. Machines are heavy, delicate, and costly. One mistake can damage the machine, stop your production, or hurt your workers. Careful machinery relocation moves your equipment safely from…

By Bestcare Facilities Group
Machinery Relocation, Nairobi Kenya
Machinery Relocation in Nairobi Kenya.

Machinery Relocation in Nairobi

Moving a machine is not like moving a table. Machines are heavy, delicate, and costly. One mistake can damage the machine, stop your production, or hurt your workers. Careful machinery relocation moves your equipment safely from one place to another and gets it working again quickly. Factories, workshops, printers, and processing plants in Nairobi, Industrial Area, Ruiru, and Athi River need this service when they expand or change premises. This guide explains the services, costs, and how to choose a trusted company.

Services provided by Bestcare Facilities Group (bestcarefacilities.com). Phone: 0709004600.

What Is Machinery Relocation?

Machinery relocation is the full process of moving machines from one site to another. It includes planning, disconnecting power and pipes, dismantling, lifting, packing, transport, and reinstallation. A good team also levels the machine, reconnects utilities, and tests it. The aim is simple: your machine arrives safely and works as before.

Why Machinery Relocation Matters

A machine that stops means lost sales. A poor move can bend frames, damage electronics, and break precision parts. Good planning shortens your downtime and protects your investment. Trained teams also protect your staff from lifting accidents. Insurance and careful records give you peace of mind if something goes wrong on the road.

Services Professional Companies Usually Offer

Most companies that provide machinery relocation offer these services:

Service

What It Does

Site survey and planning

Checks the machines, routes, doors, and floor strength

Disconnection of utilities

Safely removes power, air, water, and gas lines

Dismantling and labelling

Takes machines apart and marks every part

Packing and crating

Protects parts and electronics during travel

Rigging and lifting

Uses cranes, forklifts, and skates for heavy items

Transport

Moves machines on lowbed trucks and trailers

Reinstallation and levelling

Places machines correctly in the new site

Electrical and pipe reconnection

Connects the machine to power and services

Commissioning and testing

Proves the machine works well after the move

Storage and insurance

Keeps machines safe before and during the move

Estimated Costs of Machinery Relocation in Nairobi

The price of machinery relocation depends on the size, weight, and number of machines, and on the distance.

Service

Estimated Cost (KES)

Site survey and plan

10,000 - 40,000

Small machine move within Nairobi

40,000 - 150,000

Medium machine move

150,000 - 600,000

Full production line relocation

800,000 - 5,000,000

Crating and packing

10,000 - 80,000

Crane hire, per day

40,000 - 150,000

Storage, per month

20,000 - 100,000

Disclaimer: These costs are estimates only. Real prices change by company, machine weight, distance, and the work needed. Ask for a written quote before work starts.

How to Prepare for the Move

Good preparation saves time. Make a list of all machines and take photos of each one. Collect the manuals and wiring diagrams. Measure the doors, corridors, and gates at both sites, because many machines fail to pass through narrow spaces. Prepare the new floor, power, and ventilation before moving day. Tell your staff the schedule, so they can plan their work around the move.

Why Choose a Verified Professional Service Provider

Machines are costly, and a bad lift can destroy them in seconds. A verified provider has trained riggers, proper equipment, and clear safety rules. Check that the company is registered, has insurance, and can show earlier jobs. Ask for a written plan and a list of the steps. Reliable machinery relocation teams also take photos before and after the move, so you can check the condition of every machine.

10 Frequently Asked Questions

1. How long does machinery relocation take? A single machine can move in one or two days. A full production line may take several weeks.

2. Will my machine be insured during the move? It should be. Ask the company for transit insurance and read the paper carefully.

3. Can machines be moved without dismantling? Some can, but many need partial dismantling. The team will decide after the survey.

4. How do you move very heavy machines? Teams use cranes, forklifts, hydraulic jacks, rollers, and skates. For long distances, lowbed trucks carry the load.

5. Who reconnects the electricity? A qualified electrician should do this. Many relocation companies have their own electricians.

6. Can I keep working during the move? Often you can move machines in stages, so some lines continue working. This needs careful planning.

7. What if my machine does not start after the move? The team should test the machine, find the fault, and fix it. Ask about this in your agreement.

8. Do I need a permit? For big loads on public roads, you may need transport permits. A good company handles the papers.

9. Can you move machines to another town? Yes. Companies move machines to Mombasa, Nakuru, Kisumu, and across the border.

10. How can I lower the cost? Plan early, prepare the new site, remove other obstacles, and book a quote from more than one company.

Move Your Machines With Confidence

A careful move protects your machines and your income. Contact a verified company in Nairobi, request a site visit, and compare written quotes. With professional machinery relocation, your equipment arrives safe and gets back to work fast.

Need Machinery Relocation Services?

Machinery Relocation for you, by experienced professionals, are only a tap away! Lets Get Started Now! Get in Touch Now

Ask Now!