Floor Screeding (Industrial) A screed is a thin layer of cement mortar or special compound that is laid over a concrete base to create a smooth, level surface. In industrial buildings, screeding prepares the floor for epoxy, vinyl, tiles or other finishes. It …
On this page
Floor Screeding (Industrial)
A screed is a thin layer of cement mortar or special compound that is laid over a concrete base to create a smooth, level surface. In industrial buildings, screeding prepares the floor for epoxy, vinyl, tiles or other finishes. It can also be the final working surface in some stores and workshops. A flat and strong screed helps machines, racking systems and vehicles work properly and safely.
Services provided by Bestcare Facilities Group (bestcarefacilities.com). Phone: 0709004600.
How Industrial Screeding Is Done
The base concrete is first cleaned, roughened and repaired. A bonding agent may be applied so the screed sticks well. Guide rails or level pegs are set to control thickness and slope. Then the screed mix is placed, compacted and levelled with straight edges and power floats. Bonded screeds stick directly to the base and are usually thin. Unbonded or floating screeds sit on a membrane and are thicker. Self-levelling screeds are fluid products that spread by themselves and give a very flat surface. After placing, the screed must be cured slowly, because fast drying causes cracks and curling at the edges.
Services Professional Companies Offer
|
Service |
What It Covers |
|
Sand and cement screed |
Traditional screed for general floor levelling |
|
Self-levelling screed |
Flowing compounds for very flat floors |
|
Fibre-reinforced screed |
Screed with fibres to reduce cracking |
|
Screed to falls |
Sloped floors for drainage in wash areas |
|
Bonded and unbonded screeding |
Systems chosen by base condition and thickness |
|
Surface preparation |
Cleaning, scabbling and priming the base |
|
Power floating |
Machine finishing for large industrial floors |
|
Moisture testing |
Checking dryness before applying coatings |
|
Screed repairs |
Fixing hollow, cracked or damaged areas |
|
Curing and protection |
Keeping the screed damp while it hardens |
Estimated Costs of Industrial Floor Screeding
|
Service |
Estimated Cost (KES) |
|
Sand and cement screed (50 mm) |
700 - 1,800 per square metre |
|
Thin bonded screed |
600 - 1,500 per square metre |
|
Self-levelling screed |
1,200 - 3,500 per square metre |
|
Fibre-reinforced screed |
900 - 2,200 per square metre |
|
Screed to falls |
1,000 - 2,500 per square metre |
|
Surface preparation |
150 - 600 per square metre |
|
Power floating |
250 - 700 per square metre |
|
Screed repairs |
1,500 - 6,000 per square metre |
Disclaimer: These costs are estimates only. Final prices depend on floor area, thickness, screed type, base condition and the service provider. Ask for a written quotation before work starts.
Why Choose a Verified Professional Service Provider
A poorly laid screed sounds hollow, cracks early and makes the floor finish fail. Uneven floors also cause problems for forklifts, racks and drainage. A verified contractor uses the correct mix ratio, controls thickness and checks levels with proper tools. They also respect drying time before you add coatings or tiles. Ask for past industrial projects, flatness records and the mix design or product data sheet. A reliable company will agree on the floor tolerance in writing, protect fresh work from traffic and give you a warranty against hollow areas and early cracking.
Frequently Asked Questions
1. What is floor screeding? It is a layer of mortar or compound laid on concrete to make the floor level and smooth.
2. How thick should an industrial screed be? Bonded screeds can be 25 to 50 mm. Unbonded screeds are usually thicker, often 50 to 75 mm.
3. How long does screed take to dry? A common guide is about one day per millimetre up to 50 mm, but conditions change this.
4. Why does screed crack? Fast drying, weak mix, poor bonding, no joints or heavy early loads can all cause cracks.
5. What is a self-levelling screed? It is a liquid mix that flows across the floor and finds its own level for a very flat finish.
6. Can I screed over old concrete? Yes, if the old floor is clean, sound and properly prepared and primed.
7. Do screeds need joints? Often yes. Joints reduce cracking by allowing small movement in large floor areas.
8. Can I use the floor right after screeding? Light foot traffic may be possible after a day or two. Heavy loads need more time.
9. What is a screed to falls? It is a screed laid with a slope so water runs toward a drain.
10. How do I check screed quality? Use a straight edge for flatness, tap for hollow sounds and check moisture before the next layer.